Asphalt Binder Course - 80mm
per m² · supply & lay
£25 – £66 / m²
What is it

An 80mm compacted asphalt binder course providing the structural intermediate layer beneath the asphalt surface course.

Rate guide
Standard paving, 500–2,000m²£30 – £39/m²
Large continuous area, over 3,000m²£25 – £33/m²
Small area, under 500m²£37 – £53/m²
Restricted access or significant hand laying£46 – £66/m²
Night or weekend working£42 – £61/m²
Labour output
Large clear area with continuous deliveries1,200–1,800 m²/day
Normal road or car-park paving700–1,200 m²/day
Phased work around ironwork and interfaces350–700 m²/day
Broken-up areas or restricted hand laying120–350 m²/day
Key rate adjusters
Asphalt tonnage
Large continuous orders can reduce the rate by £3–£6/m² through improved plant, haulage and paving efficiency.
Small loads
Minimum asphalt-plant charges and part-load haulage can add £5–£12/m² on small or fragmented pours.
Access constraints
Limited paver access, short runs and hand laying typically increase the rate by 20%–45%.
Haul distance
Long journeys from the asphalt plant can add £2–£5/m² and increase the risk of rejected cold loads.
Working hours
Night, weekend or possession working commonly adds 25%–50% for labour premiums, supervision and reduced output.
Specification uplift
Polymer-modified material, special aggregate or enhanced testing can add £4–£10/m² against a conventional dense binder mix.
Quantity surveyor insights
  • Waste and buildability: Allow 3%–5% material waste for normal continuous paving, rising to 7%–10% where bays are irregular, levels vary or substantial handwork is required. Confirm that the proposed paver and delivery vehicles can access and turn without interrupting the laying train.
  • Scope and procurement: Establish whether sweeping, tack coat, regulating, testing, traffic management and ironwork adjustments sit within the paving package, as omissions can materially distort tender comparisons. Secure asphalt-plant capacity and delivery slots early, particularly for night works or remote sites where supplier competition is limited.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.