Blockwork - 140mm – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Blockwork - 140mm
per m² · supply & lay
£99 – £275 / m²
What is it

A 140mm-thick concrete block wall laid in mortar, including blocks, labour, sundries and normal main-contractor allowances.

Rate guide
Standard 7.3N medium-density aggregate blockwork£105 – £138/m²
Lightweight aggregate blockwork£99 – £132/m²
Dense or high-strength aggregate blockwork£116 – £154/m²
Fair-faced blockwork with tooled joints£132 – £176/m²
Reinforced hollow blockwork with concrete infill£198 – £275/m²
Labour output
Long, clear runs with good material distribution20–28 m²/day
Typical internal walling with normal returns14–20 m²/day
Numerous openings, piers and service interfaces9–14 m²/day
Restricted access, short runs or phased working5–9 m²/day
Key rate adjusters
Block specification
Higher-strength, dense or specialist acoustic blocks typically add £10–£30/m² through increased material cost and handling effort.
Wall geometry
Frequent corners, piers, junctions and small panels can increase the rate by 15–35% compared with uninterrupted straight runs.
Working height
Walling above normal working height can add £8–£20/m² for reduced productivity and additional access arrangements.
Openings and interfaces
Repeated doorways, penetrations and abutments can add 10–25% where cutting, bonding and making good are extensive.
Fair-face finish
Selected blocks, controlled coursing and tooled joints generally add £20–£35/m² over ordinary blockwork intended for finishes.
Location and logistics
Constrained unloading, long distribution routes or manual handling can add £8–£18/m², particularly on occupied or city-centre sites.
Quantity surveyor insights
  • Waste and buildability: Allow around 5–8% block waste for regular layouts, rising to 10–15% where there are numerous cuts, splays or service penetrations. Early coordination of coursing, openings and wall lengths materially improves gang output and reduces discarded part-blocks.
  • Scope and procurement: Confirm whether rates include movement joints, bed-joint reinforcement, ties, fire stopping, lintels, temporary support, access and final cleaning, as these are common scope gaps. Secure the block type and strength early because substitutions can affect weight, productivity, acoustic performance and lead times.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.