Blockwork - 215mm – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Blockwork - 215mm
per m² · supply & lay
£127 – £231 / m²
What is it

A 215mm-thick concrete block wall, typically constructed using standard blocks laid flat or purpose-made wide blocks bedded and jointed in mortar.

Rate guide
Standard 7.3N dense aggregate blocks laid flat£138 – £176/m²
Purpose-made 215mm hollow dense blocks£127 – £165/m²
Lightweight aggregate blocks£132 – £176/m²
High-strength dense blocks, 10.4N or above£154 – £198/m²
Fair-faced blockwork to one face£176 – £231/m²
Labour output
Long clear runs with materials close to workface12–17 m²/gang-day
Typical walling with normal corners and returns9–13 m²/gang-day
Numerous openings, piers and service interfaces6–9 m²/gang-day
Restricted access or heavily broken-up work3–6 m²/gang-day
Key rate adjusters
Block specification
Higher strengths, specialist densities or certified performance requirements typically add £10–£25/m².
Block format
Purpose-made wide hollow units can reduce laying effort by £10–£20/m² compared with standard blocks laid flat, subject to lifting constraints.
Openings and returns
Frequent jambs, corners, piers and short panels commonly increase the rate by 15–35%.
Working height
Scaffold lifts, loading platforms and additional vertical distribution can add £15–£30/m² above straightforward low-level work.
Mortar and joints
Coloured mortar, specialist mixes or tooled exposed joints generally add £5–£15/m².
Quantity and phasing
Small, intermittent or multi-visit packages can attract a 20–40% premium through lost productivity and repeated mobilisation.
Quantity surveyor insights
  • Waste and buildability: Allow around 5–8% block waste for regular layouts, rising to 10–15% where walls contain extensive cutting, raking or service penetrations; coordinated dimensions and coursing materially improve gang output.
  • Scope and procurement: Confirm responsibility for lintels, wall ties, reinforcement, movement joints, DPCs, fire stopping, access and temporary support before comparing quotations. Secure the block and mortar package early where a specific strength, density or manufacturer approval is required.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.