Concrete - Structural – cost per m³ – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Concrete - Structural
per m³ · supply & lay
£237 – £572 / m³
What is it

Structural concrete is ready-mixed in-situ concrete supplied, pumped, placed, compacted and cured to form load-bearing elements.

Rate guide
Standard C32/40, pumped placement£248 – £325/m³
C28/35, pumped placement£237 – £308/m³
High-strength C40/50£270 – £363/m³
Waterproof or enhanced-durability mix£314 – £429/m³
Small-volume or restricted-access placement£374 – £572/m³
Labour output
Large continuous pump pour with clear access90–150 m³/day
Typical slabs, walls or bases50–90 m³/day
Congested reinforcement or complex geometry20–45 m³/day
Broken-up pours or restricted access8–20 m³/day
Key rate adjusters
Strength and durability
Higher cement content, low permeability and aggressive-environment specifications typically add £15–£80/m³.
Pour volume
Small pours, part-load charges and repeated mobilisation can increase the effective rate by £35–£120/m³.
Pumping logistics
Long pipelines, additional pump attendance or specialist boom requirements commonly add £10–£45/m³.
Element complexity
Thin sections, congested reinforcement and difficult vibration can raise placing costs by 10%–25%.
Programme constraints
Out-of-hours working, short-notice bookings and accelerated pours may increase the rate by 10%–20%.
Location and access
Regional supply conditions, urban delivery restrictions and extended haulage can move rates by £15–£50/m³.
Quantity surveyor insights
  • Waste and buildability: Allow 3%–5% for normal over-ordering, pump residue and minor dimensional variation, rising to 7%–10% where pours are small or irregular; rationalised pour sizes and accessible discharge points materially improve productivity.
  • Scope and procurement: Confirm whether pumping, waiting time, cube testing, curing, construction joints and washout facilities are included, while reinforcement and formwork are usually separate; early supplier and pump bookings reduce exposure to part loads, aborted pours and premium mobilisation charges.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.