Cycle stand - Sheffield – cost per nr – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Cycle stand - Sheffield
per nr · supply & lay
£209 – £858 each
What is it

A Sheffield cycle stand is an inverted-U steel hoop fixed into or onto the ground to provide secure bicycle parking.

Rate guide
Standard galvanised mild-steel, root-fixed£264 – £374 each
Galvanised mild-steel, bolt-down to sound concrete£209 – £308 each
Powder-coated mild-steel, root-fixed£308 – £440 each
Grade 304 stainless steel, root-fixed£473 – £682 each
Heavy-duty anti-ram stand, root-fixed£572 – £858 each
Labour output
Open site, bolt-fixed to prepared concrete12–18 nr/day
Root-fixed during coordinated paving works8–12 nr/day
Existing paving carefully lifted and reinstated4–7 nr/day
Restricted or live public area with phased access2–4 nr/day
Key rate adjusters
Foundation type
Root fixing with excavation and concrete generally adds £50–£100 each compared with bolting to a suitable existing slab.
Surface reinstatement
Cutting and matching existing paving can add £60–£150 each, with higher allowances for natural stone or specialist finishes.
Material finish
Powder coating typically adds £30–£70 each, while stainless steel can increase the complete rate by 70–100%.
Order quantity
Runs of fewer than ten stands may carry a 15–30% premium because delivery, supervision and mobilisation are spread over limited units.
Site access
Restricted working hours, pedestrian segregation or hand-carried materials can increase installation costs by 20–40%.
Service risk
Scanning, trial holes and hand excavation around buried services can add £40–£120 each depending on congestion and permit controls.
Quantity surveyor insights
  • Waste and buildability: Coordinate stand positions with paving modules and reinforcement before surfaces are laid; late installation drives avoidable cutting, broken units and colour-match waste. Templates should be used to maintain consistent spacing, alignment and embedment.
  • Scope and procurement: Confirm whether the package includes foundations, pavement reinstatement, service scans, traffic management, delivery and protective finish repairs. Early procurement should also lock down steel grade, tube diameter, wall thickness and coating specification, as visually similar products can have materially different durability and cost.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026