Excavation - Hand (excluding disposal) – cost per m³ – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Excavation - Hand (excluding disposal)
per m³ · supply & lay
£105 – £572 / m³
What is it

Hand excavation of soil for foundations, trenches or local reductions, with arisings placed adjacent for subsequent handling or removal.

Rate guide
Standard/base case: ordinary soil, up to 1.5 m deep, reasonable access£154 – £231/m³
Shallow excavation in soft ground with open access£105 – £160/m³
Firm clay, compacted fill or mixed ground£209 – £319/m³
Restricted trench excavation or working around services£253 – £396/m³
Hard ground with intermittent hand breaking£352 – £572/m³
Labour output
Soft ground, shallow and open working3–5 m³/day
Ordinary soil with normal trimming2–3 m³/day
Restricted access or excavation around servicesup to 2 m³/day
Hard, obstructed or heavily broken-up ground<1 m³/day
Key rate adjusters
Ground hardness
Firm clay, compacted fill or gravel can increase the base rate by 25–50% through slower digging and additional hand tools.
Depth
Excavation below 1.5 m commonly adds 15–35% where lifting, access and safe working become more onerous.
Restricted access
Confined working areas, low headroom or long barrow routes can increase rates by 30–70%.
Existing services
Careful excavation around live or suspected services typically adds 20–50% for reduced productivity and supervision.
Water and instability
Local pumping, soft formation and repeated face collapse can add £40–£120/m³ before any formal temporary works.
Quantity and continuity
Small isolated excavations may carry a 30–60% premium because mobilisation, supervision and downtime are spread over limited volume.
Quantity surveyor insights
  • Waste and buildability: Position temporary stockpiles to avoid double handling and allow later mechanical loading; excavated soil may bulk by 20–30%, quickly consuming working space and disrupting follow-on trades.
  • Scope and procurement: Define whether the rate includes service proving, hand breaking, trench support, pumping, trimming, temporary access and movement to a designated stockpile. For uncertain ground, procure agreed gang daywork rates alongside measured rates and require contemporaneous labour and output records.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026