Excavation - Machine (excluding disposal) – cost per m³ – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Excavation - Machine (excluding disposal)
per m³ · supply & lay
£6 – £77 / m³
What is it

Machine excavation of soils to formation, including operator and normal on-site handling, but excluding off-site disposal, dewatering, excavation support and rock breaking.

Rate guide
Standard open excavation in ordinary soil£9 – £15/m³
Large-volume bulk excavation£6 – £10/m³
Trench and foundation excavation£15 – £26/m³
Restricted-access or small-volume excavation£28 – £50/m³
Hard digging or weathered rock£39 – £77/m³
Labour output
Large open area with short internal movement250–500 m³/day
Standard foundations in ordinary soil120–250 m³/day
Broken-up trench excavation50–120 m³/day
Restricted access around services or structures20–60 m³/day
Key rate adjusters
Ground conditions
Soft clay, obstructions or mixed strata can add £5–£20/m³ through slower cycles and additional machine attendance.
Excavator size
Using a machine smaller than the optimum working size can increase the excavation rate by 15–35%.
Internal haul
Moving arisings beyond the immediate excavation zone typically adds £2–£8/m³ depending on distance and loading arrangements.
Working space
Restricted slew, edge protection and work around existing structures can increase rates by 25–75%.
Quantity and continuity
Small, intermittent visits can add £500–£1,500 per mobilisation and reduce productive output materially.
Water and weather
Wet formations, pumping interruptions and cleaning of haul routes can increase excavation costs by 10–30%.
Quantity surveyor insights
  • Waste and buildability: Allow for 5–15% additional excavation where profiles are irregular, ground is unstable or working room is required; coordinated formation levels and practical batter slopes can materially reduce overdig and backfill.
  • Scope and procurement: Secure quotations that clearly allocate service proving, temporary support, dewatering, breaking obstructions, internal rehandling and final management of arisings, as these interfaces commonly create scope gaps and costly daywork.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026