← All rates

Floor decking - Chipboard – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Floor decking - Chipboard
per m² · supply & lay
£30 – £83 / m²
What is it

Structural tongue-and-groove chipboard flooring fixed over prepared timber joists or battens to form a loadbearing deck.

Rate guide
Standard 22 mm P5 moisture-resistant T&G board£33 – £44/m²
18 mm P5 moisture-resistant T&G board£30 – £40/m²
22 mm high-density or enhanced structural board£40 – £53/m²
38 mm structural T&G board£53 – £72/m²
Proprietary acoustic chipboard deck panel£57 – £83/m²
Labour output
Clear repetitive floor plates, two-person gang80–120 m²/day
Typical housing plots with routine trimming55–80 m²/day
Broken-up rooms with numerous service penetrations25–45 m²/day
Restricted access, alterations and local joist corrections12–25 m²/day
Key rate adjusters
Board specification
Moving from standard 22 mm P5 board to denser, thicker or proprietary products typically adds £6–£25/m².
Floor geometry
Irregular rooms, stair openings and extensive perimeter cutting can increase the installed rate by 10–20%.
Access and handling
Manual distribution through completed plots or upper floors commonly adds £3–£7/m².
Waste allowance
Regular layouts generally require 5–8% waste, rising to 10–15% on small or heavily divided areas.
Fixing regime
Enhanced screw centres, full joint gluing or manufacturer-specific adhesives can add £2–£5/m².
Package size
Small phases, return visits and interrupted releases can increase the rate by 15–30% through lost productivity and repeated setup.
Quantity surveyor insights
  • Waste and buildability: Coordinate board module, joist spacing, openings and service penetrations before installation; unsupported edges and excessive trimming quickly erode output and increase offcut waste.
  • Scope and procurement: Confirm whether the package includes adhesives, screws, temporary protection, joist levelling, noggins and acoustic components, and procure compatible boards and fixings from a single agreed specification to avoid warranty and substitution gaps.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.