Ask for a rate and get a FULL EXCEL BREAKDOWN OF THE RATE.
The editable build-up a QS would assemble from first principles — labour, plant, equipment, materials, outputs, waste and the full fee-on-fee ladder to a main-contractor budget rate. Your rates go in; every figure is yours to change; the fee-on-fee is shown, never hidden.
82 published budget rates · reconciled to the penny · every rate an editable workbook
A general chat model scrapes a figure. Estimate Anything constructs the rate from a live cost & productivity database — and hands you the editable sheet behind it.
| Cost component | Rate £ | Cost |
| Labour | ||
| Skilled operative (concretor) | 190.00 | £18.10 |
| General operative | 155.00 | £14.76 |
| Equipment | ||
| Poker, tamp beam, barrows, PPE | 62.00 | £5.90 |
| Net resources (labour + plant) | £38.76 | |
| Materials | ||
| C25/30 ready-mix (£120.00/m³) | 120.00 | £123.60 |
| +5% market · +20% sub O&P (on L&P) | → | |
| Subcontract rate | £177.87 | |
| +10% main-contractor O&P | → | |
| BUDGET RATE / m³ | £195.65 | |
| Budget band (−10% / +16%) | £176–£227 | |
The right-hand build-up is a live published rate (C25/30 structural concrete, mass / trench fill, per m³). The figures reconcile to the penny across the assistant, the web page and the downloadable workbook.
Because these are main-contractor budget rates, the whole fee-on-fee ladder sits on the face of every rate — exactly where a QS pricing at main-contract level needs the figure. Here it is in full for the C25/30 rate above.
| Ladder stage (per m³) | Typical |
| Net subcontract cost (full-ladder resources) | £38.76 |
| Productivity conservatism ÷ (1 − 10%) | £43.07 |
| Market / inflation uplift (+5%) | £45.22 |
| Subcontractor overhead & profit (+20%) | £54.27 |
| Bulk material at cost (MC own account — rejoins here) | £123.60 |
| Subcontract rate (price the trade charges the MC) | £177.87 |
| Main-contractor O&P (+10%) → BUDGET RATE | £195.65 |
| Budget band (−10% / +16%) | £176.09 – £226.95 |
Scope: a budget rate. Preliminaries, scaffold, main-contractor lifting / craneage and VAT are excluded and stated as such on every rate.
Every plan — including the free taste — hands you the full editable Excel build-up. No metered downloads, no rollover, cancel any time.
Ask for any UK construction rate and get the full editable Excel breakdown — the structure a QS trusts, with a sourced default in every cell you overwrite.
Start free — then £10 or £30/mo