Browse all rates Start free — 3 messages
AI cost-breakdown assistant

10× better than Claude/ChatGPT
for construction rates.

Ask for a rate and get a FULL EXCEL BREAKDOWN OF THE RATE.

The editable build-up a QS would assemble from first principles — labour, plant, equipment, materials, outputs, waste and the full fee-on-fee ladder to a main-contractor budget rate. Your rates go in; every figure is yours to change; the fee-on-fee is shown, never hidden.

82 published budget rates · reconciled to the penny · every rate an editable workbook

The same question · two answers

One gives you a number.
The other gives you the build-up.

A general chat model scrapes a figure. Estimate Anything constructs the rate from a live cost & productivity database — and hands you the editable sheet behind it.

Ask a rateC25/30 structural concrete — budget rate per m³? Ask
ChatGPT / Claude
scans the internet quickly
returns a single figure
£190?
one number — no working shown
  • no breakdown
  • little validation
  • accuracy unknown
  • nothing to edit or defend
Illustrative of the form of the answer, not a quote.
Estimate Anything AI
draws on a large item COST database + PRODUCTIVITY database
builds the rate from FIRST PRINCIPLES
C25/30 concrete — build-up£ / m³
Cost componentRate £Cost
Labour
Skilled operative (concretor)190.00£18.10
General operative155.00£14.76
Equipment
Poker, tamp beam, barrows, PPE62.00£5.90
Net resources (labour + plant)£38.76
Materials
C25/30 ready-mix (£120.00/m³)120.00£123.60
+5% market · +20% sub O&P (on L&P)
Subcontract rate£177.87
+10% main-contractor O&P
BUDGET RATE / m³£195.65
Budget band (−10% / +16%)£176–£227
Every blue figure is yours to overwrite — the budget recomputes as you type.
What it’s for
  1. A credible budget rate, instantly.
  2. 80% of the way to an accurate rate — you just update the major components with your own local rates.

The right-hand build-up is a live published rate (C25/30 structural concrete, mass / trench fill, per m³). The figures reconcile to the penny across the assistant, the web page and the downloadable workbook.

The proof

The full fee-on-fee build-up — nothing hidden

Because these are main-contractor budget rates, the whole fee-on-fee ladder sits on the face of every rate — exactly where a QS pricing at main-contract level needs the figure. Here it is in full for the C25/30 rate above.

Ladder stage (per m³)Typical
Net subcontract cost (full-ladder resources)£38.76
Productivity conservatism ÷ (1 − 10%)£43.07
Market / inflation uplift (+5%)£45.22
Subcontractor overhead & profit (+20%)£54.27
Bulk material at cost (MC own account — rejoins here)£123.60
Subcontract rate (price the trade charges the MC)£177.87
Main-contractor O&P (+10%) → BUDGET RATE£195.65
Budget band (−10% / +16%)£176.09 – £226.95

Scope: a budget rate. Preliminaries, scaffold, main-contractor lifting / craneage and VAT are excluded and stated as such on every rate.

How it works

Describe it. Get the build-up. Make it yours.

01
Describe the activity
In normal estimating language — BoQ-style item, unit (m²/m³/m/nr), grade and spec.
02
Get the build-up
Itemised resources, quantities, outputs, waste, the fee-on-fee ladder, the budget rate and the band — every default price dated and sourced.
03
Make it yours
Download the editable Excel build-up. Every blue cell is yours to change; the budget rate recomputes as you type.
Why estimators trust it

Not “accurate rates”. The structure that makes a rate defensible.

Scope

What a budget rate excludes

Pricing

Try three free. Then £10 or £30 a month.

Every plan — including the free taste — hands you the full editable Excel build-up. No metered downloads, no rollover, cancel any time.

Step 1 · free
Free taste
£0
3 messages per email, ever
Full-fat answers and the editable Excel on all three. Magic-link sign-in — no card.
Step 2 · keep going
Starter
£10/mo
100 messages a month
Every published rate and every new one, with its workbook.
5× the messages
Step 3 · at pace
Professional
£30/mo
500 messages a month
Five times the Starter allowance — a real day-rate tool for a busy desk.

The build-up in seconds. Your rates. Your judgement.

Ask for any UK construction rate and get the full editable Excel breakdown — the structure a QS trusts, with a sourced default in every cell you overwrite.

Start free — then £10 or £30/mo