Gully - Road gully set – cost per nr – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Gully - Road gully set
per nr · supply & lay
£1045 – £2970 each
What is it

A road gully set comprises a trapped precast chamber, grating and frame, excavation, bedding, surround and connection to the surface-water drain.

Rate guide
Standard road gully in new carriageway, up to 1.2 m deep£1045 – £1485 each
Standard gully with D400 heavy-duty grating and frame£1210 – £1705 each
Gully installed in existing carriageway with saw-cutting and reinstatement£1650 – £2530 each
Deep gully installation, 1.2–2.0 m deep£1870 – £2970 each
Restricted-access or hand-excavated installation£1815 – £2860 each
Labour output
New-build carriageway with clear access and prepared drainage run3–5 nr/day
Normal excavation with local service avoidance2–3 nr/day
Existing carriageway requiring breakout and reinstatement1–2 nr/day
Restricted access, hand digging or congested servicesup to 1 nr/day
Key rate adjusters
Excavation depth
Increasing depth beyond 1.2 m typically adds £250–£700 each through extra excavation, support, lifting and backfill.
Surface reinstatement
Saw-cutting and reinstating an existing asphalt carriageway generally adds £400–£900 each.
Ground conditions
Rock, running sand or contaminated arisings can increase the installed rate by 20–50%.
Service congestion
Trial holes, hand excavation and service protection commonly add £250–£750 each.
Grating specification
Moving from a standard highway grating to a higher-specification hinged, locking or cycle-safe unit can add £100–£350 each.
Drain connection
A long, deep or difficult lateral connection can add £150–£600 each compared with a short connection into an accessible drainage run.
Quantity surveyor insights
  • Waste and buildability: Allow for concrete, granular backfill and asphalt wastage where isolated gullies create small, inefficient work faces; coordinating excavation with the main drainage gang can reduce the rate by around 10–15%.
  • Scope and procurement: Confirm whether traffic management, dewatering, disposal, lateral pipework, testing and final surfacing sit within the gully package, as omitted interfaces can readily add £500–£1,500 each; early procurement of specified gratings also limits substitution and programme risk.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026