Kerb - HB2 laying – cost per m – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Kerb - HB2 laying
per m · supply & lay
£39 – £149 / m
What is it

HB2 laying comprises supplying and installing 125 × 255 mm half-battered precast concrete kerbs on a concrete bed with concrete haunching.

Rate guide
Standard straight run, supply and lay£64 – £86/m
Laying only with free-issued kerbs£39 – £53/m
Curved run using purpose-made radius kerbs£90 – £132/m
Dropped crossing with transition kerbs£99 – £149/m
Short, isolated or broken-up runs£83 – £116/m
Labour output
Long straight run with clear access45–65 m/day
Typical estate road with junctions30–45 m/day
Curves, drops and frequent transitions18–30 m/day
Restricted access or broken-up work10–20 m/day
Key rate adjusters
Ground preparation
Formation trimming, disposal and additional sub-base can add £15–£30/m where a ready-to-kerb base is not provided.
Concrete provision
Higher concrete grades, larger haunches or small-load charges can increase the rate by £5–£12/m.
Curves and specials
Radius, dropper and transition units typically increase installed rates by 30–60% through higher material cost and reduced output.
Run length
Continuous runs above 250 m can reduce rates by 8–15%, while isolated lengths below 25 m may add 20–40%.
Access and logistics
Restricted deliveries, hand distribution or work behind barriers can add £10–£25/m.
Location and programme
London, constrained urban sites or accelerated working can command a 10–20% premium over normal regional conditions.
Quantity surveyor insights
  • Waste and buildability: Allow 3–5% kerb waste for straight work and 5–10% where cuts, curves and transitions are frequent; coordinated setting-out and correct radius selection materially reduce cutting and abortive work.
  • Scope gap and procurement: Confirm whether the package includes formation preparation, sub-base, concrete, disposal, dropped units, traffic management and reinstatement. Early procurement of radius and transition kerbs protects the programme and avoids costly site-cut substitutes.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026