Partition - Metal stud – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Partition - Metal stud
per m² · supply & lay
£64 – £204 / m²
What is it

A non-loadbearing internal partition formed from galvanised steel studs and tracks, plasterboard linings, insulation and joint treatment.

Rate guide
Standard 70mm stud, single 12.5mm board each side, acoustic quilt and taped joints£79 – £101/m²
Slim 50mm stud, single board each side, no insulation£64 – £79/m²
70mm stud, double board each side with acoustic quilt£108 – £141/m²
92mm stud, enhanced acoustic boards and insulation£123 – £163/m²
High-performance fire and acoustic partition, double specialist boards each side£149 – £204/m²
Labour output
Long clear runs with repetitive layout28–38 m²/day
Typical rooms with regular corners and openings20–28 m²/day
Numerous doors, junctions and service interfaces13–20 m²/day
Restricted access, short runs or phased working8–14 m²/day
Key rate adjusters
Partition height
Heights above 3.0m typically add 10–25% through heavier framing, additional bracing and reduced labour output.
Board specification
Fire, moisture-resistant, impact-resistant or high-density acoustic boards commonly add £8–£25/m² depending on layers and manufacturer.
Acoustic performance
Resilient bars, specialist insulation and sealed perimeters can increase the rate by £12–£35/m².
Openings and corners
Frequent doorways, deflection heads, corners and abutments can add 15–30% to otherwise repetitive partition runs.
Access and logistics
Restricted delivery routes, occupied areas or out-of-hours installation may increase rates by 10–25%.
Finishing standard
Moving from taped joints to a full plaster skim generally adds £10–£16/m², subject to programme and area.
Quantity surveyor insights
  • Waste and buildability: Allow 7–10% board waste on regular layouts and 12–15% where partitions are short, angled or opening-heavy. Early coordination of stud centres, board orientation and service zones reduces cutting, reinforcement and abortive work.
  • Scope and procurement: Confirm whether the package includes insulation, deflection heads, plywood pattressing, door framing, sealants, access panels and final decoration, as these are frequent scope gaps. Secure the tested partition system as a complete manufacturer-compliant build-up rather than mixing components solely on lowest unit price.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026