← All rates

Render - External – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Render - External
per m² · supply & lay
£77 – £248 / m²
What is it

External render is a weather-resistant decorative coating system applied to external wall substrates in one or more reinforced or finished layers.

Rate guide
Standard two-coat sand-and-cement render with painted finish£77 – £110/m²
Through-coloured monocouche render£83 – £121/m²
Silicone thin-coat render system on prepared masonry£94 – £138/m²
Traditional lime render, three-coat finish£127 – £193/m²
Insulated render system with 100mm EPS insulation£171 – £248/m²
Labour output
Large clear elevations with mechanical mixing35–50 m²/day
Typical housing elevations with regular openings25–35 m²/day
Broken façades with returns, beads and detailing14–22 m²/day
Restricted access or small isolated work areas8–15 m²/day
Key rate adjusters
Substrate preparation
Cleaning, hacking off, dubbing out and applying bonding treatments typically adds £8–£30/m².
Reinforcement
Full-surface mesh reinforcement and additional stress patches can increase the rate by £10–£20/m².
Openings and details
Frequent windows, reveals, corners, movement joints and stop beads commonly add 15–30% through reduced productivity.
Access provision
Independent scaffolding, loading bays and protective sheeting can add £15–£40/m² of rendered elevation.
Finish selection
Premium silicone, textured or specialist coloured finishes generally add £8–£25/m² against a standard painted finish.
Project scale
Small or phased packages below about 250m² may attract a 15–35% uplift for mobilisation, minimum orders and repeated setup.
Quantity surveyor insights
  • Waste and buildability: Allow 7–12% material waste for bagged and thin-coat systems, rising where colour batches, narrow piers and numerous openings prevent efficient use; rationalised beads, uninterrupted lifts and consistent substrates materially improve output.
  • Scope and procurement: Confirm responsibility for scaffold, substrate repairs, movement joints, sealants, mesh, beads, sample panels and final decoration before tendering, as these are frequent scope gaps; procure complete proprietary systems through an approved installer where warranty and colour consistency are required.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.