← All rates

Road Gully (Set Complete) – cost per nr – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

See the full build-up — try free →
Labour, plant, materials, outputs and waste — yours to edit, as an Excel. Three free.

Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.

Road gully — set complete
per m² · supply & lay
£515 – £929 / nr
What is it

The construction of one precast concrete trapped ROAD gully — a 450 mm diameter, 750 mm deep (70 L) gully pot with a Class D400 ductile grating & frame, set complete and priced per nr (each). A road gully is the trapped surface-water inlet a drainage BoQ measures separately from the pipe runs. The rate carries the whole operation:

  1. Excavated & surrounded — the pit is machine-dug and a C20/25 concrete bed & surround placed to the gully pot.
  2. Set — the precast trapped gully pot set to level on the bed, and the D400 ductile grating & frame set to finished road level on the surround.
  3. Backfilled — the gully backfilled & compacted around the surround, ready for the connecting run.
Rate range
Low£515 – £664 / nr
Typical£596 – £768 / nr
High£721 – £929 / nr

Budget rate per m².

3 key cost drivers
Gully size & depth
A deeper 450 × 900 mm (95 L) gully needs more precast, more concrete surround and a slower pit dig than the 450 × 750 mm default; a large yard gully more again. Size and depth are the biggest drivers of the per-nr rate.
Cover / grating class
A trafficked carriageway needs a heavy Class D400 ductile grating (the priced default); a footway (C250) or pedestrian area (B125) takes a lighter, cheaper grating. Location also sets how much dig support and reinstatement the pit needs. Described drivers, priced by swapping the grating and size.
Location
London and the South East typically add around 20% to labour.
Estimator

Budget rate generator

£596 – £768 / nr
Covers the pit excavation, C20/25 bed & surround, gully pot, D400 grating & frame, backfill and O&P · excl. the connecting drainage run, disposal of arisings, kerb & VAT
Exclusions
  • Lifting & material distribution — telehandler / forklift, hoist and site-distribution labour (an attendance, in main-contractor prelims)
  • The connecting drainage run to the manhole/sewer, disposal of surplus arisings, deep-dig support & dewatering
  • The surrounding kerb/channel, and any carriageway/pavement reinstatement above the grating
  • Scaffold supply (usually in preliminaries)
  • Preliminaries — main-contractor site set-up, management & welfare
  • VAT
Estimate Anything →