Roof tiling — concrete interlocking
per m² · supply & lay
£41 – £79 / m²
What is it

The supply and fixing of a pitched-roof covering of large-format concrete interlocking tiles (~10 tiles/m²), laid on a breathable underlay and treated battens and fixed per BS5534, priced per m² of roof slope. Concrete interlocking tiles are the mainstream UK budget pitched-roof covering — large tiles that lock together, laying fast with few tiles per m². The rate carries three operations:

  1. Underlay — a BBA/LABC breathable membrane laid over the rafters with 150 mm laps.
  2. Battened — treated 25×50 mm BS5534 battens fixed to the tile gauge.
  3. Tiled — the interlocking tiles loaded out, set out, laid, nailed & clipped to the exposure requirement.
Rate range
Low£41 – £53 / m²
Typical£47 – £61 / m²
High£61 – £79 / m²

Budget rate per m².

3 key cost drivers
Roof complexity & access
A simple duo-pitch gable with easy access tiles fastest; hips, valleys, dormers and abutments add cutting waste and set-out time, and steep pitches or restricted access slow the gang. It is a key driver of the labour per m².
Tile type
Large concrete interlocking tiles (~10/m²) are the priced default and lay fastest. Small-format plain concrete or clay tiles (~60/m²) and natural slate are dearer coverings laid more slowly — priced separately. It is a key driver of both material cost and laying speed.
Location
London and the South East typically add around 20% to labour.
Estimator

Budget rate generator

£47 – £61 / m²
Covers the interlocking tiles, breathable underlay, treated battens, fixings, the tiling gang and O&P · excl. structure, ridge/verge/flashings, strip-off, scaffold & VAT
Exclusions
  • Lifting & material distribution — telehandler / forklift, hoist and site-distribution labour (an attendance, in main-contractor prelims)
  • The roof structure (rafters/trusses), ridge, hip, verge, valley & abutment linear details
  • Fascia/soffit/gutters, leadwork & flashings, strip-off & disposal, insulation & scaffold
  • Scaffold supply (usually in preliminaries)
  • Preliminaries — main-contractor site set-up, management & welfare
  • VAT