Steelwork - Protective coating – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Steelwork - Protective coating
per m² · supply & lay
£15 – £99 / m²
What is it

Protective coating is a prepared and applied paint system that limits corrosion of structural steelwork in its intended exposure environment.

Rate guide
Standard shop-applied three-coat epoxy/polyurethane system£39 – £55/m²
Shop-applied primer only£15 – £24/m²
High-build two-coat epoxy system£31 – £46/m²
Hot-dip galvanised finish to suitable fabricated steelwork£50 – £77/m²
Site blast-clean and maintenance recoat system£61 – £99/m²
Labour output
Shop spray application to open, repetitive steelwork100–180 m²/day
Site application with clear access and grouped members50–90 m²/day
Complex connections, edges and intermittent members25–50 m²/day
Restricted access, phased working or occupied areas12–30 m²/day
Key rate adjusters
Surface preparation
Upgrading from mechanical preparation to abrasive blast-cleaning typically adds £12–£30/m².
Steel complexity
Dense connections, small members and numerous edges can increase the coating rate by 15–35%.
Access provision
Mobile platforms, scaffold interfaces or difficult high-level access can add £10–£35/m².
Exposure class
Marine, industrial or chemically aggressive environments can add £8–£25/m² through heavier and more specialist systems.
Small quantities
Mobilisation, colour setup and minimum-order charges can add £8–£20/m² on fragmented packages.
Programme constraints
Out-of-hours working, multiple visits or accelerated curing requirements commonly increase costs by 10–20%.
Quantity surveyor insights
  • Waste and buildability: Allow for overspray, stripe coating and additional work at welds, bolts and sharp edges; compact trusses and latticed steel can consume substantially more material and labour than their apparent surface area suggests.
  • Scope and procurement: Confirm responsibility for preparation standard, shop primer repairs, final coats, transport damage and site touch-up before tender return, then procure the complete compatible system from one accountable coating supplier or applicator.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026