Tiling - Floor – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

The instant AI answer for any UK construction rate — with the full researched Excel build-up behind it
Ask any rate and get an expert, itemised answer in seconds, then request the fully-researched editable Excel.
Tiling - Floor
per m² · supply & lay
£72 – £209 / m²
What is it

Floor tiling comprises the supply and fixing of tiles to prepared internal floor substrates, including adhesive, grout, cuts and routine wastage.

Rate guide
Standard ceramic tiles, regular layout£72 – £99/m²
Standard porcelain tiles, regular layout£83 – £116/m²
Commercial anti-slip porcelain tiles£94 – £132/m²
Large-format porcelain tiles£110 – £160/m²
Natural stone floor tiles£138 – £209/m²
Labour output
Open-plan area, regular ceramic tiles18–25 m²/day
Typical rooms with moderate cutting12–18 m²/day
Large-format tiles requiring levelling8–13 m²/day
Broken-up or access-restricted areas5–9 m²/day
Key rate adjusters
Substrate preparation
Localised smoothing may add £5–£12/m², while extensive levelling or remedial screeding can add £15–£35/m².
Tile selection
Premium porcelain, stone or specialist finishes can increase the installed rate by £25–£100/m² through higher material cost and slower cutting.
Tile format
Large-format units typically add 15–35% because of handling, bedding tolerances and levelling-system requirements.
Layout complexity
Diagonal, herringbone or multi-size patterns commonly increase fixing costs by 15–30% through additional setting out and waste.
Movement joints
Proprietary movement joints and perimeter details generally add £8–£20 per linear metre depending on profile and substrate conditions.
Access and phasing
Small workfaces, out-of-hours working or multiple visits can increase rates by 10–25% owing to reduced output and repeated mobilisation.
Quantity surveyor insights
  • Waste and buildability: Allow 7–10% waste for regular layouts and 12–18% for patterned work, awkward rooms or large-format tiles; confirm finished floor levels, falls and door clearances before procurement.
  • Scope and procurement: Clarify responsibility for screeds, membranes, primers, trims, movement joints and sealants, as these are frequent scope gaps; secure tile batches early to manage lead times, shade consistency and replacement-stock risk.

Estimate Anything AI answer · indicative budget rates · updated 31 August 2026

Request the Excel build-up for this rate →
See how Estimate Anything researches the fully-itemised, editable Excel build-up behind this rate — get started free.