140mm Blockwork: Aircrete 3.6N – cost per m² – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

See the full build-up — try free →
Labour, plant, materials, outputs and waste — yours to edit, as an Excel. Three free.

Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.

140mm aircrete 3.6N blockwork
per m² · supply & lay
£87 – £138 / m²
What is it

The supply and laying of a single skin of 140 mm aircrete (autoclaved aerated) blockwork of 3.6 N/mm² grade to a vertical wall, priced per m² of wall face. The aircrete block is a lightweight thermal AAC unit — the common choice for insulating inner leaves and internal load-bearing walls where thermal performance and fast single-hand laying matter. Laid here on traditional sand-cement mortar. One finish is priced:

  1. Standard — a common-face block, to be plastered, rendered, painted or dry-lined; the usual choice and the default rate.
Rate range by wall complexity
Simple£87 – £113 / m²
Standard£95 – £123 / m²
Complex£107 – £138 / m²

Budget rate per m².

3 key cost drivers
Wall complexity
Openings, returns, piers and reveals slow the gang and add cutting waste. It is a key driver of the rate.
Wall thickness
This rate is for a 140 mm aircrete block. A thicker block is a dearer unit and beds in more mortar than the 100 mm leaf; aircrete is light and lays fast, so laying speed is set more by the block type than its weight. Thickness is a key driver of material cost.
Location
London and the South East typically add around 20% to labour.
Estimator

Budget rate generator

£95 – £123 / m²
Covers 140 mm aircrete 3.6N blocks, bedding mortar, the laying gang and O&P · excl. prelims, scaffold & VAT
Exclusions
  • Lifting & material distribution — telehandler / forklift, hoist and site-distribution labour (an attendance, in main-contractor prelims)
  • DPC, lintels, wall ties & cavity insulation, movement joints
  • Wall finishes — plaster, render or dry-lining
  • Scaffold supply (usually in preliminaries)
  • Preliminaries — main-contractor site set-up, management & welfare
  • VAT