← All rates

C25/30 Concrete: RC25/30 Structural Grade – cost per m³ – UK 2026 Rate Guide

Budget rate for supply & lay · typical budget rate before your adjustments

See the full build-up — try free →
Labour, plant, materials, outputs and waste — yours to edit, as an Excel. Three free.

Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.

C25/30 concrete
per m³ · supply & lay
£152 – £261 / m³
What is it

The supply and placing of C25/30 ready-mixed concrete — the general structural / reinforced grade (designated RC25/30) used for reinforced foundations, ground beams, pile caps, ground-bearing slabs and general RC work — discharged into the works and placed, tamped and compacted, priced per m³ of concrete placed. This headline prices the concrete on the standard mass / trench-fill placing output: the place-level-vibrate operation is the same whatever the grade, and formwork and reinforcement are separately measured items. It is a full-pour, direct-discharge rate, with pumping, part loads and barrowed delivery as the variants below.

A note on the number, for estimators: this is a MAIN-CONTRACTOR budget rate, and the ready-mixed concrete is around 74% of it. The delivered mix is validated at £105–£135/m³ ex-VAT (ConcreteMath / Mister Concrete / RMS 2026, national supply-only). On a main-contractor budget rate the bought-in ready-mix is ordered on the contractor’s own account, so it carries the main-contractor O&P only — it is NOT marked up with the market +5% or the sub-contractor O&P +20% (those fall on the laying gang, which does carry the full ladder). The nearest published supply-and-lay benchmark is a low-grade groundworks figure of £90–£130/m³ (a lower-grade reference); a designated C25/30 structural rate sits above it — for the richer mix, and because it still carries the main-contractor margin. That is the expected relationship, not an error: it is where a QS pricing sublet concrete at main-contract level needs the rate to sit. The rate range, low to high:

  1. Low — larger loads and competitive ready-mix supply.
  2. Standard — a typical project and merchant price; the default rate.
  3. High — smaller loads or higher-cost areas.
Rate range
Low£152 – £197 / m³
Standard£176 – £227 / m³
High£203 – £261 / m³

Budget rate per m³.

3 key cost drivers
Concrete mix & bought-in share
C25/30 (RC25/30) ready-mixed concrete is around 74% of the rate, so the mix grade and the delivered merchant price set most of it. A richer grade or a long delivery lifts the material cost — and, because it still carries the main-contractor O&P, the rate per m³ with it.
Pour size & delivery
The headline is a full load discharged straight off the truck. Small or part loads add a surcharge and standing time; pumping adds a line pump and a pump-grade supplement; barrowing or dumpering adds a third operative — the calculator prices the standard direct-discharge case, with these as options.
Supply & quantity
Merchant prices for the bought-in materials move with supplier, account and load size, and the published band already spans that range. Rates are UK non-London; London & the South East typically run dearer — adjust the build-up.
Estimator

Budget rate generator

£176 – £227 / m³
Covers C25/30 (RC25/30) ready-mixed concrete, the placing gang & O&P, full pour direct-discharge · excl. formwork, reinforcement, trench excavation, prelims & VAT
Exclusions
  • Formwork, edge shuttering & expansion / movement joints
  • Reinforcement — mesh, bar, chairs & spacers (a separately measured item)
  • Trench or basement excavation, disposal & formation preparation
  • Power-float, brushed / tamped decorative finishes & surface treatments beyond a plain tamped mass-fill finish
  • Pumping, part-load & standing-time surcharges where the pour is not a full direct-discharge load
  • VAT
Estimate Anything →
See how it beats ChatGPT for construction rates — the full editable Excel build-up, three free