Budget rate for supply & lay · typical budget rate before your adjustments
Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.
The supply and placing of C35/45 ready-mixed concrete — the high-strength structural grade (designated RC35/45) used for heavily-loaded and durability-critical foundations, ground beams, transfer slabs, columns and precast / prestressed work above C30/37 — discharged into the works and placed, tamped and compacted, priced per m³ of concrete placed. This headline prices the concrete on the standard mass / trench-fill placing output: the place-level-vibrate operation is the same whatever the grade, and formwork and reinforcement are separately measured items. It is a full-pour, direct-discharge rate, with pumping, part loads and barrowed delivery as the variants below.
A note on the number, for estimators: this is a MAIN-CONTRACTOR budget rate, and the ready-mixed concrete is around 76% of it. The delivered mix is validated at £118–£145/m³ ex-VAT (ConcreteMath / RMS / Mister Concrete 2026, national supply-only). On a main-contractor budget rate the bought-in ready-mix is ordered on the contractor’s own account, so it carries the main-contractor O&P only — it is NOT marked up with the market +5% or the sub-contractor O&P +20% (those fall on the laying gang, which does carry the full ladder). The nearest published supply-and-lay benchmark is a low-grade groundworks figure of £90–£130/m³ (a much lower-grade reference); a designated C35/45 high-strength structural rate sits well above it — for the far richer mix, and because it still carries the main-contractor margin. That is the expected relationship, not an error: it is where a QS pricing sublet concrete at main-contract level needs the rate to sit. The rate range, low to high:
Budget rate per m³.
Budget rate generator