Budget rate for supply & lay · typical budget rate before your adjustments
Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.
The construction of a freestanding non-loadbearing internal PARTITION on a light-gauge galvanised metal frame — 70 mm ‘C’ studs at 600 mm centres in ‘U’ head & floor tracks — with a 25 mm acoustic mineral-wool quilt pushed into the stud cavity, 12.5 mm tapered-edge plasterboard screw-fixed to BOTH faces and a 2–3 mm multi-finish skim to each face, priced per m² of finished partition. One m² of partition carries two boarded & skimmed faces plus the shared frame and quilt. This is the standard fit-out internal-walling line — the whole wall, not a lining applied to an existing background (that is a separate rate). The rate carries four operations by one drylining gang:
Budget rate per m².