Budget rate for supply & lay · typical budget rate before your adjustments
Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.
The supply and laying of a ~90 mm asphalt carriageway resurface — a ~60 mm AC20 binder course under a ~30 mm AC10 (or SMA) surface course, machine-laid in two passes to a prepared, structurally-adequate base — priced per m² of finished road. Tack/bond coats bond the base and the interlayer; both courses are laid to line & level by the paver and rolled to density. This rate prices the binder + surface resurface ONLY — planing/excavation of the old road, kerbs, ironwork, markings and traffic management are separate items. The rate carries three operations:
Budget rate per m².
Budget rate generator