Budget rate for supply & lay · typical budget rate before your adjustments
Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.
The supply and application of a ~100 mm continuous thermoplastic (hot-applied screed) road-marking line to a prepared, sound carriageway surface, priced per metre of line. A road-marking gang melts the thermoplastic screed in the pre-melt boiler and applies it to line with the screed applicator, dropping glass beads onto the hot material for reflectivity. This rate prices the supply & application of the continuous line ONLY — surface preparation, pre-marking / setting-out survey, removal of old lines, reflective studs, arrows, letters, symbols & hatching, and the carriageway courses laid or planed are all separate items. The rate carries three operations:
Budget rate per m².
Budget rate generator