Timber First-Fix Floor Joists – cost per m² – UK 2026 Rate Guide
Budget rate for supply & lay · typical budget rate before your adjustments
See the full build-up — try free →
Labour, plant, materials, outputs and waste — yours to edit, as an Excel. Three free.
Rates are UK national (non-London): central London and constrained urban sites typically run dearer — adjust the labour, plant and access lines in the build-up accordingly.
What is it
The supply and fixing of a first-fix timber floor structure — C24 softwood floor joists set out, hung and fixed to gauge with mid-span strutting/blocking, joist hangers, lateral restraint straps and fixings — priced per m² of floor area. C24 solid joists at ~400 mm centres are the mainstream UK budget timber floor carcass. This rate prices the STRUCTURE only — the floor decking (chipboard/ply/T&G), the insulation between joists and any second-fix carpentry are separate rates. The rate carries three operations:
- Set out & hang — C24 joists (47 × 195 mm at ~400 mm centres) loaded out, set out to gauge and hung on hangers or seated on wall plates.
- Strut & brace — a mid-span row of herringbone or solid strutting/blocking cut & fixed, and lateral restraint straps fixed to the surrounding walls.
- Fix off — the whole carcass nailed/screwed off to a level, braced floor ready to receive its decking.
Rate range
Budget rate per m².
3 key cost drivers
Floor complexity & access
A simple rectangular floor with clear access hangs fastest; many openings, trimmers, stairwells, steel bearings or restricted access add cutting and fixing time. It is a key driver of the labour per m².
Member type
Solid C24 softwood joists at ~400 mm centres are the priced default. Engineered I-joists, metal-web posi-joists and deeper/closer sections for longer spans are different members at different material cost and output — priced separately. It is a key driver of both material cost and speed.
Location
London and the South East typically add around 20% to labour.
Estimator
Budget rate generator
£46 – £59 / m²
Covers the C24 joists, hangers, strutting, restraint straps, fixings, the carpentry gang and O&P · excl. decking, insulation, bearings & steel beams, structural design, scaffold & VAT
Exclusions
- Lifting & material distribution — telehandler / forklift, hoist and site-distribution labour (an attendance, in main-contractor prelims)
- The floor decking / boarding (chipboard, ply or T&G) and insulation between joists
- Masonry / steel bearings & structural steel beams, structural design, and access / scaffold
- Scaffold supply (usually in preliminaries)
- Preliminaries — main-contractor site set-up, management & welfare
- VAT